欢迎进入币游官网(币游国际官网),币游官网:www.9cx.net开放币游网址访问、币游会员注册、币游代理申请、币游电脑客户端、币游手机版下载等业务。

首页社会正文

博彩平台大全(www.99cx.vip):HSS Engineers secures RM16.6mil VO for ECRL supervising works

admin2022-09-0111

usdt接口平台www.trc20.vip)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键出售Usdt。

KUALA LUMPUR: HSS Engineers Bhd's unit HSS Integrated Sdn Bhd has been awarded a RM16.6mil variation order (VO) to provide supervising works for Section 9 of the East Coast Rail Link (ECRL) from Serendah to Port Klang.

In a statement, the engineering consultant said the 53.5km section consists of tunnels, viaducts, at-grade sections and stations.

The VO pertains to the letter of appointment HSS Engineers received from China Communications Construction (ECRL) Sdn Bhd in December 2017 to provide supervising consultancy services for infrastructure works from Ch 0+000 to Ch 231+500 for a total contract sum of RM82.5mil.

,

博彩平台大全www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。博彩平台大全上最新博彩平台登录线路、博彩平台代理网址更新最快。博彩平台大全开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

According to HSS Engineering executive director Sharifah Azlina Raja Kamal Pasmah, overall construction works for the ECRL were well underway with reported progress of 28.57% as at April 2022.

"We are heartened by the opportunity to reprise and even expand our role to carry on the project's momentum, especially in the crucial linkage in the Klang Valley," she said.

The project works are targeted for completion by the fourth quarter of the financial year ended Dec 31, 2027.

With the latest contract win, the group said its unbilled orderbook stands at RM530mil year-to-date, which will provide earnings visibility until 2027.


转载说明:本文转载自Sunbet。

网友评论

1条评论

最新评论